Emergencies P&F Assist Help Desk  
Click on the project link for more information
Click here for more information about this project

Student Residences Project

Project Scope: Three new buildings with self-catered accommodation for 1300+ students in apartments, studio rooms and loft rooms with easy access to common space.

Click here for more information about this project

Mansfield Place Upgrade

Project Scope: The Mansfield Place upgrade and extension is designed to allow staff and students to have walkways and outdoor seating in a natural setting located on a main thoroughfare of the campus

Click here for more information about this project

Herston Campus Entry Sign

Project Scope: The sign placement is to allow sight lines to vehicles travelling in both directions along Herston Road as well as a sight line to pedestrians on Herston Road accessing the Herston Busway Station.

Click here for more information about this project

Gatton Infrastructure Upgrade

Project Scope: Upgrade of electrical infrastructure to cope with forecasted loads and align with Sustainability goals.

 

Click on the project link for more information
Click here for more information about this project

St Lucia Campus - Keith Street Childcare Centre

Project Scope: A new 154 place centre is proposed to be constructed in the existing front carpark site along Keith Street and Sir Fred Schonell Drive

Click here for more information about this project

St Lucia Campus - Mayne Centre Heat Pump Screen

Project Scope: To install a more efficient system that can achieve the desired humidity levels and deliver significant energy savings.

Click here for more information about this project

St Lucia Campus - UQ Centre Entry

Project Scope: This project seeks to address a number of access, visibility and queuing issues surrounding the entrance plaza from Campbell Place.

 

Click on the project link for more information
Click here for more information about this project

St Lucia Campus - Otto Hirschfeld Façade & Associated Works

Project Scope: The proposal will involve systematic inspection of rendering, removal of all drummy rendering, and repairing concrete works in accordance with engineer’s specifications including the application of a waterproof membrane paint

 

Click on the project link for more information
Click here for more information about this project

Gatton Campus - Library Extension

Project Scope: extend the library to allow for extra study desks, available on a 24 hour basis and refurbish the existing space.

Click here for more information about this project

Gatton Campus - Rugby Pavilion

Project Scope: provide a sheltered spectator platform and a secure servery/storage facility.

Click here for more information about this project

St Lucia Campus - Oval 7 Grandstand Extension

Project Scope: relocate a high performance gym into the grandstand lower level which will provide a close-by training facility to service rugby, rowing and external clients. Improve storage capacity at the grandstand.

Click here for more information about this project

St Lucia Campus - Ovals 2 and 3 Pavilion

Project Scope: demolish the existing building and construct a new building on the same site with improved facilities.

 

Click on the project link for more information
Click here for more information about this project

St Lucia Campus - Therapies Rooftop Addition

Project Scope: provide a new Mock Hospital Ward and seminar room for teaching purposes on Level 6 of the Therapies Annex Building.

Click here for more information about this project

St Lucia Campus David Thiele 25m pool

Project Scope: construct a new 25m pool including an extension along the southern side of its current fenced area and development of a new landscaped area adjacent to the new fencing.

Click here for more information about this project

St Lucia Campus - GP South BldgLevels 2 and 3 Refurbishment

Project Scope: Levels 2 and 3 - Refurbishment Centrally Controlled Teaching Rooms and Collaborative Learning Spaces

Click here for more information about this project

St Lucia Ferry Walk Enhancement

Project Scope: a new footpath to address the issue of people shortcutting across the existing turf with additional lighting and security cameras. There will also be landscaped elements at the commencement and the end of the path.

Click here for more information about this project

Gatton Childcare Centre Extension

Project Scope: build an additional building to extend the child care centre.

 

Click on the project link for more information
Click here for more information about this project

St Lucia Campus - Forgan Smith TC Beirne School of Law Refurbishment

Project Scope: refurbishment aimed to be a major showpiece for both the TC Beirne School of Law and the University of Queensland.

Click here for more information about this project

Upland Road Clinics

Project Scope: refurbish existing houses along Upland Road to accommodate School of Psychology clinical space adjacent to the main campus and assist in alleviating their current space issues being experienced with the growth of their clinics.

Click here for more information about this project

St Lucia Campus - James & Mary Emelia Mayne Centre Roof Repairs

Project Scope: rectify significant leaks into the building as a result of a major storm event in November 2014.

Click here for more information about this project

Herston Campus - Mayne Medical Bldg Outdoor Podum

Project Scope: conversion of an existing exposed first floor slab (over the old Animal House) of the Mayne Medical Building (0881) to an informal student learning (outdoor) space.

 

Click on the project link for more information
Click here for more information about this project

St Lucia Campus - Hawken Building BBQ Facilities

Project Scope: Construct a built-in BBQ facility for use by undergraduate engineering societies, for industry engagement and for social activities.

 

Click on the project link for more information
Click here for more information about this project

St Lucia Campus - Duhig North New Roof

Project Scope: Duhig North Roof eaves will extend out to the maximum of 3m.

 

Click on the project link for more information
Click here for more information about this project

Gatton Campus - Tractor Shed Extension

Project Scope: The School of Agriculture and Food Sciences is extending its tractor and storage shed to locate extra equipment and store samples.

Click here for more information about this project

St Lucia campus - Forgan Smith and Duhig Tower Lift Motor Room Roofing

Project Scope: The roof of the lift motor room in the Forgan Smith Tower has been modified with additional flashing for the Forgan Smith parapet. The Duhig Tower lift motor room requires a new roof to be installed with a small down pipe.

 

Click on the project link for more information
Click here for more information about this project

St Lucia campus - St Johns College

Project Scope: Refurbishment of the St John's College Foundation Court

Click here for more information about this project

St Lucia campus - Bldg 69 Telecommunication Tower

Project Scope: Installation of telecommunication tower on Building 69

 

Click on the project link for more information
Click here for more information about this project

Gatton Campus - Cattle Teaching Facility Darbalara Vet School

Project Scope: The School of Veterinary Science is intending to relocate the beef cattle teaching herd currently located at Pinjarra Hills to the Darbalara Farm. This project is to construct a set of cattle yards and a small building at the Darbalara Farm located approximately 6 kilometres from the Gatton Campus.

 

Click on the project link for more information
Click here for more information about this project

St Lucia Campus -Synthetic Fields and Carpark

Project Scope: Construction of two synthetic sporting fields on the Oval 4 and the adjacent softball diamond sites, built on top of a ground level 500 space car park structure. It includes construction of ancillary elements associated with the sporting fields (e.g. upgrade existing field lighting, goal boxes, seating, dug outs, fencing and safety netting etc), connection linkages to the Lakes walkway and landscaping

Click here for more information about this project

St Lucia Campus - Lakes Bus Station Pedestrian Link

Project Scope: A new service entry will be installed with an automatic sliding door with door frames and glazing to match existing windows and a new delivery bay and s modified walkway will be of concrete slabs finish to match existing.

Click here for more information about this project

St Lucia Campus - Signage

Project Scope: The Entry Statement Sign will be constructed using similar design elements and materials to that of the current sign on Sir Fred Schonell Drive. A combination of backlit illuminated UQ logo and up-lighting of base plinth, again to match the current sign.

Click here for more information about this project

St Lucia Campus - Physics Annexe New Roof

Project Scope: The roof of the Physics Annex Building has passed its useful life and needs to be replaced. P&F has planned the replacement, which would also include relocating the existing stormwater systems to the exterior of the building.

Click here for more information about this project

St Lucia Campus - Duchesne College Entry Upgrade

Project Scope: The Project was initiated by the Duchesne College facilities committee in response to the following site issues: Site Identification, Safe Access and Visual Amenity. Works will be completed to the following areas: Main Entry Driveway, Central Landscape, Informal Pedestrian Access, Lighting and Ancillary Electrical Works

Click here for more information about this project

Gatton Campus - Plant Industries Building

Project Scope: Internal refurbishment of the laboratories in Building 8111 at Gatton and includes a shade structure to be installed over a forecourt area. This will also give the building a clear front entry that will be more readily accessible and enhance the look and the functionality of the building entry regime.

Click here for more information about this project

PACE - VIE Tank

Project Scope: Due to changes in the current Australian Standards surrounding the handling of gasses and to cost increases in inspection requirements, modifications to the current gas storage tanks is required.

 

Click on the project link for more information
Click here for more information about this project

St Lucia Campus - King’s College Upland Road Wing and Learning Centre Extension

Project Scope: The King’s College first stage of its 10-year master plan which includes an extension to the existing Learning Centre, a new accommodation wing at the front of the site, and a significant reconfiguration of the front entry.

Click here for more information about this project

St Lucia Campus - Hartley Teakle Building Service Access & Delivery Bay

Project Scope: A new service entry will be installed with an automatic sliding door with door frames and glazing to match existing windows and a new delivery bay and s modified walkway will be of concrete slabs finish to match existing.

Click on the project link for more information
Click here for more information about this project

Gate and Path Access to Union College, St Lucia

Project Scope: Proposed access ramp, stairs and access gate to Union College was approved for construction.

Click here for more information about this project

UQ Robotics Lab, Hawken Building, St Lucia

Project Scope: Alterations to the Hawken Engineering Building to accommodate the Robotics Design Laboratory to establish a facility for research, fabrication and testing.

Click here for more information about this project

Kings College Master Plan, St Lucia

Project Scope: The King’s College Master Plan - a review of the College site and buildings to accommodate the College’s needs over the next 10 years.

Click here for more information about this project

Community Garden, Gatton

Project Scope: The project incorporates a community garden, a Resource Recovery Centre (RRC) (waste recycling facility) and a green waste facility at Gatton Campus.

Click here for more information about this project

Student Housing, St Lucia

Project Scope: The Walcott Street and Hood Street sites were approved for development of the Student Housing Project for construction to deliver high quality self-catering on-campus student accommodation facilities.

Click here for more information about this project

Child Care Centre, St Lucia

Project Scope: The proposed siting on Keith Street of a new 82 place Childcare Centre at UQ St Lucia Campus was approved.

 

Click on the project link for more information
Click here for more information about this project

Gatton - Natural Draft Dry Cooling Tower

Project Scope: The Queensland Geothermal Energy Centre of Excellence has proposed that a Natural Draft Dry Cooling Tower (NDDCT) be located on the southern part of the Gatton Campus.

Click here for more information about this project

Pinjarra Hills - Small Mammal Enclosure

Project Scope:The Terrestrial Ecology Research Facility (TERF) at Pinjarra requires a series of small animal enclosures to maintain small marsupial mice for experiments run by the School of Biological Sciences.

 

Click on the project link for more information
Click here for more information about this project

Gatton - Energex Comms Pole Sub 0

Project Scope: As part of the Solar Flagships project, Energex requires UQ to install a communication link from the array into the Eneregx network.

Click here for more information about this project

Long Pocket - Block C and Block D, ISSR

Project Scope: The relocation of the ISSR from the St Lucia campus will involve the redevelopment and refurbishment of two of the existing site buildings – namely Blocks C and D at the UQ Long Pocket Site.

Click here for more information about this project

St Lucia - Hawken Level 5, Dow Centre

Project Scope: The project involves refurbishment of existing office space on Level 5 of the Hawken Engineering Building, an area of approximately 230m2 in total.

Click here for more information about this project

St Lucia - Glasshouse Storage Shed

Project Scope: The proposal for the new 10.5 by 8.85 by 3.6 metre high Glasshouse Storage Shed comprises a reinforced concrete floor and a structural steel frame with prefinished metal external cladding.

Click here for more information about this project

St Lucia - Synthetic Sporting Fields

Project Scope: UQSPORT has a growing demand for synthetic sporting fields at UQ St Lucia. This submission seeks only site approval at this stage.

Click here for more information about this project

St Lucia - Building 4 Alterations, ATSIS

Project Scope: The proposed project comprises internal refurbishment of Bldg 4 Level 1 entry and Level 2 office space including toilet and kitchen facilities, an area of approximately 470m2 in total.

 

Click on the project link for more information
Click here for more information about this project

St Lucia Campus - Ferry Terminal

Project Scope: The floods in January 2011 severely damaged the CityCat and City Ferry terminals along the Brisbane River. During the process of re-establishing the terminals State Government announced an open competition to design a new ‘iconic’ ferry terminal with improved flood resilience. An allocation has been made to replace the current facility with the iconic design.

Click here for more information about this project

St Lucia Campus - Computer Sciences Chiller Precinct Upgrade

Project Scope: Upgrade the chillers located on Level 1 of the Computer Sciences Building.  These chillers supply chilled water to the Computer Sciences, John Hines, Priestley, Prentice, Physiology, JD Story and Brian Wilson Chancellery buildings. 

Click here for more information about this project

St Lucia Campus - Social Sciences Façade Modifications

Project Scope: Room S432 Social Sciences Building has been allocated to the Faculty of Health and Behavioural Sciences to accommodate additional staff and it is proposed to install two new windows to match existing windows on this façade.

 

Click on the project link for more information
Click here for more information about this project

Gatton Campus - Solar Research Building

Project Scope: UQ is the lead research institution in a Solar Flagships consortium with AGL, First Solar & UNSW. As part of this program, the Federal Government has provided UQ with $21.7M of EIF funds to build a 3.275 MW research solar array at the Gatton Campus.

Click here for more information about this project

St Lucia Campus - UQ Union Arcade & Loading Dock

Project Scope: UQ Union (UQU) has designed this proposal for the union complex to address numerous infrastructure problems that have been identified by UQU and various stakeholders from the University community that will improve access and the social and operational function of UQU.

Click here for more information about this project

Long Pocket Site - Boundary Fence, Signage & Building Demolitions

Project Scope: UQ has secured the Long Pocket site on a 99 year lease from the State Government. Project is to install a new site fence, signage and demolition of a number of buildings that are derelict and beyond repair.

Click here for more information about this project

St Lucia Campus - Cromwell College Dining Terrace

Project Scope: Dining Terrace provides break out space adjacent to the existing Dining Hall for the residents to interact and socialise in an alfresco setting.

 

Click on the project link for more information
Click here for more information about this project

Women's College Master Plan, St Lucia

Project Scope: The Women's College Council has undertaken a review of the College site and buildings and approved a Master Plan to cater for the College's needs over the next 10 years.

Click here for more information about this project

Chilled Water Plant, Therapies Building, St Lucia

Project Scope: The replacement of the existing chilled water plant serving the Otto Hirschfeld precinct, which has operational issues.

Click here for more information about this project

Demolition of Barns, Gatton

Project Scope: To sustain the expansion in farming area, required for various Research and Teaching programs, the removal of two barns would open the area for additional cultivation.

Click here for more information about this project

Project Updates - June 2013

Project Scope: Photos of the latest projects.

 

Click on the project link for more information
Click here for more information about this project

Gatton Site Development Plan - Senate approved 28/06/12

Project Scope: The review of the Gatton Campus and recommendations for the future development and guiding the development of the site.

Click here for more information about this project

Sustainability Walks St Lucia Campus- Senate approved 24/04/12

Project Scope: As part of the Sustainability Walk project, signage will include information about the biodiversity of the lake highlighting some of the native plant and animal species that can be found in and around the lake.

Click here for more information about this project

ARCHIBUS

P&F has implemented "ARCHIBUS", an enterprise facilities management system which provides a range of integrated modules for the management of space, real estate and asset management. Project information and updates are posted on the ARCHIBUS project website - www.pf.uq.edu.au/archibus

 

 

Go to top